What We Do

Services

The full list of deck work we quote and build, from a new deck to fixing an old one.

HomeServices

Everything we take on

Every job below is one we do ourselves across Mobile.

Deck Installation

We frame and build new decks from the footings up, using pressure-treated pine, cedar or composite decking. Board spacing, joist spacing and fastener choice all get picked for how they'll hold up against Gulf Coast humidity and afternoon storms.

Deck Repair

Soft or spongy boards, loose railings and sinking footings usually mean rot or a footing that's shifted in Mobile's clay-heavy soil. We replace what's failed and check the joists underneath before we ever touch the surface boards.

Deck Staining & Sealing

UV and salt air break down unsealed wood fast this close to the coast. We strip old finish, let the wood dry to the right moisture level, and apply a stain or sealer built for high humidity instead of a big-box product that peels in a year.

Custom Deck Design

Multi-level decks, built-in bench seating, pergolas and stairs laid out to fit how your yard slopes. We draw it out before we cut anything, so you know where the beam lines and post footings land.

Screened Porch & Deck Combos

We frame a screened section onto an existing or new deck so you can sit outside without feeding the mosquitoes. Roof tie-in and flashing get done right so it doesn't leak into the framing below.

Deck Framing & Structural Repair

Beams, joists and ledger boards take the real load, and they're usually the first thing to go when a deck feels unsafe. We check for rot at the ledger connection first, since that's where most failures start.

Composite Decking Installation

Composite boards like Trex or TimberTech don't rot or splinter, but they still need the right joist spacing and hidden fastener system to lie flat. We install them to the manufacturer's span tables, not by eyeballing it.

Deck Railing Repair & Installation

Loose balusters, wobbly top rails and gaps that don't meet code are the most common calls we get. Alabama residential code sets minimum rail height and baluster spacing, and we build to that even on repairs.

Deck Demolition & Removal

Sometimes the old deck isn't worth saving and it's cheaper to start clean. We tear it out, haul off the lumber, and check the ledger and siding behind it for water damage before anything new goes up.

Pergolas & Deck Covers

A pergola or a solid roof over part of the deck cuts down on direct sun and gives you shade without losing the outdoor feel. We tie the structure into existing framing or set new posts and footings, depending on what your deck can carry.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Mobile, AL

Deck installation and repair covers Mobile and the surrounding Gulf Coast towns.

Mobile, AL
Daphne, AL
Fairhope, AL
Foley, AL
Prichard, AL
Saraland, AL
Gulf Shores, AL
Spanish Fort, AL
Bay Minette, AL
Robertsdale, AL
Chickasaw, AL
Common Questions

Things worth asking

Questions that come up once a deck project is actually underway.

Do I need a permit for a new deck?
Most decks over 30 inches off the ground require a building permit and inspection in Mobile County, and permit rules can apply even to repairs that touch the structural frame. The permit application and inspection scheduling are typically handled by the deck contractor, not the homeowner.
How long does it take to build a deck?
A standard single-level deck, roughly 300 to 400 square feet, usually takes five to eight working days from footings to final board. Multi-level decks, screened additions or bad weather can stretch that timeline out.
Can a deck be built within a set budget?
Deck size, decking material and railing style can all be adjusted to fit a target budget, and pressure-treated pine costs significantly less than composite or cedar. A written quote breaks down where the money goes so a homeowner can decide what to cut if needed.
Is deck construction work guaranteed?
Workmanship on deck construction is covered by warranty for a set period after completion, separate from the manufacturer's warranty on the decking material itself. The length of coverage is spelled out in the written quote.
Who do I talk to during the deck project?
One point of contact handles scheduling and questions throughout a deck build, rather than a different person answering each time. That same contact calls if the schedule shifts because of weather or a material delay.
What decking materials do you work with?
Pressure-treated southern yellow pine, cedar and composite brands like Trex and TimberTech are the main decking materials used, along with pressure-treated or steel framing underneath. Each material has a different lifespan and maintenance schedule, explained during the quote.
Can I still use my yard while the deck is being built?
Most of the yard stays usable during a deck build, though the immediate work area has to stay clear for safety and material staging. Pets and kids are best kept away from the site until framing is complete and nails and screws are cleared.
How should I prepare before the crew arrives?
Clearing furniture, grills and potted plants off the existing deck or the build area saves time on the first day. Anything attached to the house near the ledger board, like a light fixture or hose bib, is worth pointing out ahead of time.
What happens if you find rot once the old deck comes off?
Hidden rot in a ledger board, house siding or floor joists sometimes only shows up once old decking is removed, and it gets flagged before any new framing goes up. A change order with the added cost is presented for approval before that repair continues.
How do I take care of a new deck once it's finished?
Pressure-treated wood decks need restaining every two to three years on the Gulf Coast because of sun and humidity, while composite decking mainly just needs periodic washing. Keeping planters and grills off the boards long-term also helps prevent staining and trapped moisture.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (251) 274-8981